|
Tools required:
Screw driver, electric drill, 1/8" wood drill bit, rubber mallet, 2 adjustable wrenches, saw or utility knife.
People required:
Two
Time:
Weekend project
Other required work:
Create foundation, electrical hook up by licensed electrician (if heating with electric jetted/filter system)
The Process
1.) Prepare the foundation

2.) Tub shipped with floor preasembled
3.) Position the floor in place

4.) Install the stave
5.) Install seats

6.) Install plumbing
7.) Completed tub Enjoy
|